Home / ES(D)G / ESDG / Climate Action / Organochlorine and Hydrocarbon Remediation by Adsorptive and Oxidative Barriers

Organochlorine and Hydrocarbon Remediation by Adsorptive and Oxidative Barriers

Geoambiente develops hydrogeological model resulting in cleaner aquifers and safer drinking water

SUSTAINABILITY CHALLENGE

Climate Action & Land and Water Resources

A 3d model of a building with a yellow circle in the middle.

Story Highlights

Relevant UN Sustainable Development Goals (SDGs)

SDG Goal 6 clean water and sanitation.

SDG Goal 9 industry, innovation and infrastructure.

SDG Goal 15 Life on land logo.

UTILIZED SOFTWARE

Leapfrog Works

LOCATION

Brazil

ORGANIZATION/COMPANY

Geoambiente S/A

PROJECT SUMMARY

In the late 1970s, a sprawling, 116,000-square-meter industrial complex in Brazil began manufacturing agricultural machinery and vehicles. Decades of machining, tooling, painting, and washing vehicle parts, in addition to other industrial processes, polluted the area with organochlorine and hydrocarbon contaminants. Though these plumes are affecting local aquifers used for obtaining drinking water, the full scope of contamination has never been fully understood. Geoambiente used Leapfrog to develop a hydrogeological model of the entire area, allowing them to estimate with a high degree of certainty the contaminants’ sources and their total masses, as well as mapping entrapment and migration zones. With the knowledge gained from the model, the company placed absorptive barriers in areas with the highest concentration of contaminants. In just six months, Geoambiente’s solution significantly reduced contaminant levels, including a complete elimination of dichloroethylene and vinyl chloride, a 99% reduction in Benzene, and a 72% reduction in trichloroethylene. The result are cleaner aquifers and safer drinking water.

20% Off Bentley Software

Deal Ends Friday

Use Coupon Code "THANKS24"

Celebrate Infrastructure Delivery & Performance Excellence

The 2024 Year in Infrastructure
and Going Digital Awards

Nominate a project for the most prestigious awards in infrastructure! Extended deadline to enter is April 29th.