Home / Resources

Resources

Resource Center

Learn more about Bentley software and services

E-Book
CAD Modeling and Visualization

10 Creative Buildings and Interiors Design Projects Using MicroStation

Architects and interior designers around the world trust MicroStation.

User Story
Utility and Communication Networks

Exo Inc. Stabilizes Damaged Grid Tower Supporting Critical Power Source to Central Missouri

Using Digital Twins Saved Four to Six Weeks Remediating the Structure, Preventing Significant Power Loss During a Global Pandemic.

User Story
Hydraulics and Hydrology

Sabesp Establishes Open, Connected Hydraulic Modeling Environment for São Paulo

OpenFlows™ Helped Establish a Digital Twin Solution That Resulted in 30% Reduction in Overflows and Backflows.

User Story
Bridge Design

Tecne Systra Improves Safety and Sustainability of Italy’s Decades-old Autostrade Tunnels

Bentley’s OpenTunnel® Designer Helped Reduce Project Delivery Time by 21.5%, Saving Nearly EUR 26,600.

User Story
Construction Management

Guangdong Airport Authority Delivers the Largest Reconstruction and Expansion Project in China’s Civil Aviation Airport Construction

Using iTwin® and SYNCHRO™ Saved CNY 78 Million and Shortened Construction by 33 Days.

E-Book
Roads and Site Design

OpenRoads Designer

Project team members can incorporate data types across multiple disciplines.

E-Book
Roads and Site Design

An Engineering Guide for Secure Environment Design

In this e-book, you will discover how to reshape road engineering by leveraging comprehensive planning and design capabilities.

User Story
CAD Modeling and Visualization

COPEL Distribuição S.A. Establishes a Complete Digital Environment for Developing New Electrical Substations

Bentley Applications Automates Design and Leverages a Component Library, Speeding Development While Saving Money.

E-Book
Roads and Site Design

Designing for Complete Streets with OpenRoads Designer

Modern Street Design for Sustainable Communities.

Data Sheet
Utility and Communication Networks

OpenUtilities® sisNET

Design, Document, and Manage Energy and Water and Wastewater Networks.

User Story
Offshore Structural Analysis

Transporting 3×330 Class Barge Loaded with Jacket Onboard Semi-Submersible Vessel

Innovative transportation method using MOSES™ and SACS™ cuts sailing time in half.

E-Book
Building Design

OpenBuildings® Designer

Redefining BIM Collaboration and Efficiency.