Home / ES(D)G / ESDG / Climate Action / Preparation of Drainage Master Plan and Detailed Project Report for Stormwater Drainage System in Srinagar City, Jammu, and Kashmir

Preparation of Drainage Master Plan and Detailed Project Report for Stormwater Drainage System in Srinagar City, Jammu, and Kashmir

M/s Egis India Consulting Engineers creating future-proofing stormwater drainage system in Srinagar City

SUSTAINABILITY CHALLENGE

Climate Action & Land and Water Resources

A map showing the location of a lake.

Story Highlights

Relevant UN Sustainable Development Goals (SDGs)

SDG Goal 11 sustainable cities and communities.

SDG Goal 13 climate action.

UTILIZED SOFTWARE

Bentley Configuration Explorer, CONNECTION Client, GeoStudio, iTwin, Leapfrog Geo, Leapfrog Works, OpenBridge Designer, OpenBridge Modeler, OpenGround, PLAXIS, ProjectWise

LOCATION

UK

ORGANIZATION/COMPANY

Arcadis

PROJECT SUMMARY

The new South Dock pedestrian bridge in London’s iconic Canary Wharf will improve urban connectivity and encourage active sustainable transport, as well as lower carbon emissions and improve air quality. Designed as a bascule bridge with an overall span of 75 meters and a lifting span of 35 meters, the project presents technical and architectural challenges, which include a striking aesthetic design as well as counterweighted bascule spans and bridge operating equipment within the north abutment, both of which will reduce energy use. Arcadis used Bentley applications to establish a connected data environment and a federated model that accurately visualizes subsurface geology. Through digital planning and design, the team reduced embodied carbon and provided a basis for construction monitoring and proactive maintenance, minimizing environmental impact beyond simply providing accessible, low-carbon transportation.

20% Off Bentley Software

Deal Ends Friday

Use Coupon Code "THANKS24"