SYNCHRO Case Studies
Real SYNCHRO users, real success stories.
Featured User Story
Proicere Digital
MODERN NUCLEAR WASTE TREATMENT FACILITY PROJECT SET TO HOUSE WORLD’S LARGEST CIVIL STOCKPILE OF PLUTONIUM.
The Sellafield Retreatment Plant (SRP) is part of the United Kingdom’s Nuclear Decommissioning Authority’s (NDA) initiative to gradually transfer, repackage, and safely store 140 tons of separated plutonium for 100 years, playing a vital role in safeguarding public health, protecting the environment, and advancing scientific knowledge.

Browse Case Studies

Jacobs-Greenman-Pedersen Inc. JV
INNOVATIVE FLOOD RESILIENCE PROJECT IN THE HEART OF NEW YORK CITY
The Brooklyn Bridge Montgomery Coastal Resiliency project is a critical initiative designed to protect New York City from flooding and enhance the resiliency of communities at risk of storm surges. The project will serve as a benchmark for coastal resilience in the face of global warming and rising sea levels.

PT Hutama Karya (Persero)
PT HUTAMA KARYA BUILDS SMARTER, SUSTAINABLE SUBSTATIONS IN JAKARTA
Jakarta Mass Rapid Transit is an ambitious project to expand public transport in the city, with phase 2A focusing on the northward expansion of the Red Line from Bundaran to Kota.

Laing O’Rourke
Builds a 52,888-seat Iconic Stadium Supporting Everton Football Club and Regeneration of North Liverpool
Laing O’Rourke implemented 4D dynamic digital construction delivery to meet stringent logistical and heritage requirements.

South Eastern Program Alliance (SEPA)
REMOVING 85 LEVEL CROSSINGS FOR SAFER TRAVEL AND REDUCTIONS IN ROADBLOCKS AND COLLISIONS
SYNCHRO helped teams visualize construction in 4D and cut development time to three months, minimizing traffic disruption. The 4D model enabled the team to develop construction staging plans 71.5% faster.

Project Controls Cubed (PC3)
ADVANCING WASTEWATER TREATMENT TO HELP RELIEVE MULTIYEAR DROUGHT IN SACRAMENTO
Project Controls Cubed (PC3) upgrades the Sacramento Regional Wastewater Treatment Plant, providing safe and reliable treated water for recycled water use while saving USD 400 million in budget.

John Sisk & Son
REVITALIZING DUBLIN CITY CENTRE WITH MODERN MIXED-USE BUILDING
Sisk Coordinates one of the largest retail and office development projects in Dublin City Centre, despite space limitations and many logistical challenges.

Solid Support
50% IN TIME SAVED WITH 4D SIMULATION OF BRIDGE CONSTRUCTION
Solid Support Animates Australia’s First Diagonal Arch Bridge Helping Win Bid for Construction Company.

Danish Road Directorate
THE AGE OF DIGITAL DELIVERY
Danish Road Directorate uses SYNCHRO 4D with their new Infrastructure Plan 2035, raising the level for BIM in road, rail, and bridge construction in Denmark.

ACCIONA
MODERNIZING MELBOURNE’S RAIL INFRASTRUCTURE
ACCIONA Dramatically Reduces Staging Time and Drafting Requests To Deliver the Level Crossing Removal Program.

SKANSKA
HIGH PROFILE M42 JUNCTION 6 SCHEME
Skanska Utilizes Virtual Construction Rehearsal to Ensure Seamless Bridge Installation on Busy Motorway.
Digital Construction Delivery Software
Plan, optimize, and track projects in a single environment to increase safety and reduce project risks.