Home / Search Results for 'list/app/author.htm' / Page 21

Showing results for list app author htm attrition

revitalizing-florida-favorite-rebuilding-americas-infrastructure

[…] aesthetic elements of an historic structure can be incorporated into a modern design. Spanning the Matanzas River, this two-lane movable bridge, which was built in 1927, is listed on the National Register of Historic Places. Built in the Mediterranean Revival style art-deco design, the bridge is a point of pride for the residents of […]

Read More >

BSY-120221-Human-interest-sistech

[…] kimchi preparation and preservation is called gimjang. This group or family ritual is such a highly regarded and special South Korean tradition that in 2013 it was listed as a UNESCO Intangible Cultural Heritage . As a significant ethnic food and intrinsic component of Korean life, the status of the country’s cabbage crop has […]

Read More >

Service-Level-Agreement-ProjectWise-Design-Integration-server

[…] fix will reduce the Priority of an incident to reflect the residual impact. Bentley reserves the right to determine the priority classification in accordance with the above listed definitions. “Response Times” and “Resolution Times” commence from the point in time when accurate and complete information regarding the incident or interruption has been communicated and […]

Read More >

ig-openflows-advantage

[…] re investment Advanced Support and Custom Training Dedicated suppo rt and personalized one-on-one are included for no additional fees. No Hidden Prices Our affo rdable prices are listed on our website so there are no surprises. Infinitely Scalable Plan, design, and operate intelligent water and wastewater infrastructure from ve ry lar ge to ve […]

Read More >

2023-going-digital-awards-faqs

[…] in each category as finalists, and they are invited to Singapore to present before the judges and press. The judges assess each project based on the criteria listed for the award category and according to these standards: • Provided quantitative, measurable, numeric data (where applicable) • Exhibited a sustainable way forward, both economically and […]

Read More >

WaterGEMS-ReadMe-File

[…] Display: As per minimum operating system requirements. When running WaterGEMS CONNECT Edition in the AutoCAD or ArcGIS platforms, the minimum requirements are superseded by the minimum requirements listed for those platforms. Installation Instructions To install Bentley WaterGEMS CONNECT Edition: 1. In an Explorer window, double-click the WaterGEMS CONNECT Edition set-up executable. 2. In the […]

Read More >

SewerGEMS-ReadMe-File

[…] Display : As per minimum operating system requirements. When running SewerGEMS CONNECT in the AutoCAD or ArcGIS platforms, the minimum requirements are superseded by the minimum requirements listed for those platforms. Installation Instructions When you purchase SewerGEMS, you will receive an email with a license key and instruction. Save that key. Download the product […]

Read More >

Service Level Agreement

[…] the Priority of an incident to reflect the remaining impact to the user. Bentley reserves the right to determine the Priority classification in accordance with the above listed definitions. Response, Resolution and Update target levels are indicators and serve as benchmarks for the Bentley Support teams. Response Times and Resolution Times commence from the […]

Read More >

Service Level Agreement -ProjectWiseDIServer

[…] fix will reduce the Priority of an incident to reflect the residual impact. Bentley reserves the right to determine the priority classification in accordance with the above listed definitions. “Response Times” and “Resolution Times” commence from the point in time when accurate and complete information regarding the incident or interruption has been communicated and […]

Read More >

WP_Sustaining_Infrastructure_LTR_EN_LR

[…] and private industry on this topic abound. Insufficient numbers are entering the engineering fields. A Google search on technical skill shortage will return over a million hits, listing page after page of white papers, news reports, seminars, conferences, government policies, and so on, all focused on assessing, mitigating, and overcoming the issue of an […]

Read More >

Powered-by-iTwin-Program-Guide-EN-0721

[…] overview POWERED BY ITWIN GUIDE I BENTLEY SYSTEMS 3 The program gives your application increased exposure and differentiation in the market. benefits Powered by iTwin badge Product listing in Powered by iTwin Directory Quote from Bentley executive for your promotional press release Announcement of product accreditation via Bentley Systems social media POWERED BY ITWIN […]

Read More >

ebook-let-your-saving-flow-with-openflows-en-lr

[…] webinars, blogs, tutorials, and more. You can use: � On-demand Training: Courses and learning paths database – Find Training (bentley.com) Virtual classroom – Bentley Systems Learning Opportunities Listing � Formal Expert Training: On-demand and live training are included with SELECT/ELS licenses – Bentley LEARNserver � Keys: Every Virtuoso subscription to OpenFlows software includes complimentary […]

Read More >

Contact Bentley

[…] connect! Start a Live Chat Today. Chat Now Need support? Get Support ❯ Sales inquiry Contact Sales ❯ Contact Sales × Close Find a Channel Partner Partner Listing ❯ Headquarters North America Corporate Headquarters Bentley Systems, Incorporated 685 Stockton Drive Exton, PA 19341, United States  For all non-sales inquiries:  1 800 BENTLEY (1 800 […]

Read More >

CS-Cairn-LTR-EN-LR

[…] company, as well as the entire oil and gas industry. Find out about Bentley at: www.bentley.com Contact Bentley 1-800-BENTLEY (1-800-236-8539) Outside the US +1 610-458-5000 Global Office Listings www.bentley.com/contact “Successful SWIM implementation has reduced the probability of personnel missing potential well integrity issues, thereby enabling a proactive approach toward integrity management to eliminate possible […]

Read More >

CS-SMRT-Trains-LTR-EN-LR

[…] Bentley’s AssetWise Linear Analytics as the basis of their predictive decision support system. Image courtesy of SMRT Trains Ltd. As of August 2019, SMRT achieved 1 million MKBF across all rail lines. Image courtesy of SMRT Trains Ltd. FIND OUT MORE AT BENTLEY.COM 1.800.BENTLEY (1.800.236.8539) | Outside the US +1.610.458.5000 I GLOBAL OFFICE LISTINGS bentley.com/contact

Read More >

Featured Software

MicroStation

MicroStation Software Logo White

MicroStation

Model, document, access, and view architectural, engineering, mapping, construction, and operations design information with the power and flexibility you need for any size project.

ProjectWise

ProjectWise Software Logo White

ProjectWise

Leverage digital design delivery, portfolio intelligence, data governance, and enhanced engineering work-in-progress capabilities to improve project performance and productivity with ProjectWise, powered by iTwin.

SYNCHRO 4D

SYNCHRO Software Logo White

SYNCHRO 4D

Manage your projects efficiently with virtual construction, planning, and model-based workflows, field to office.

OpenFlows
WaterGEMS

OpenFlows Software Logo White

OpenFlows
WaterGEMS

Comprehensive decision-support software for you to design, plan, and operate your water distribution systems.

Digital Twins

iTwin Software Logo White

Digital Twins

Take a look at what Digital Twins are, how they benefit you, and how it all works!

OpenRoads Designer

OpenRoads Software Logo White

OpenRoads Designer

Comprehensive detailed design and documentation for roadway projects including surveying, drainage, subsurface utilities, and visualization in on application.

STAAD

STAAD Software Logo White

STAAD

Analyze and design any structure, simple or complex, and share the synchronized model with confidence for multidiscipline team collaboration.

PLAXIS 3D

PLAXIS Software Logo White

PLAXIS 3D

Perform powerful 3D analysis of deformation and stability in geotechnical engineering and rock mechanics with PLAXIS 3D.

Celebrate Infrastructure Delivery & Performance Excellence

The 2024 Year in Infrastructure
and Going Digital Awards

Nominate a project for the most prestigious awards in infrastructure! Extended deadline to enter is April 29th.