Home / Comprehensive Application Of BIM-Based Digital And Intelligent Design And Construction For The Liaozi Grand Bridge
PROJECT
Organization/Company

China Railway Changjiang Transportation Design Group Co., Ltd. Road & Bridge International Co., Ltd. Chongqing Expressway Group Co., Ltd.

Project Title

Comprehensive Application Of BIM-Based Digital And Intelligent Design And Construction For The Liaozi Grand Bridge

Award Category
Bentley Year in Infrastructure 2024
Location
Chongqing City, Chongqing, China
Utilized Software 

iTwin Capture, LumenRT, OpenBridge, OpenRoads, ProStructures

Image Credit: China Railway Changjiang Transportation Design Group Co., Ltd. Road & Bridge International Co., Ltd. Chongqing Expressway Group Co., Ltd.
Project Summary

Liaozi Grand Bridge is the final link along the Chongqing Chengkou-Kaizhou Expressway that will connect the Qinba region to the rest of the county, reducing travel times by one-third and promoting industrial and economic development that will revitalize the rural mountainous area. The large-span arch bridge has a main deck length of 252 meters, with its highest point 186 meters above the river surface. The multiple bridge components and steep terrain presented design and construction challenges requiring comprehensive application of BIM-based digital workflows.

The project team selected Bentley’s integrated reality modeling and BIM applications to generate a reality mesh of the existing site from drone-captured images, as well as a 3D bridge model. Using Bentley applications, they developed a digital modeling and construction management platform, reducing design time by 300 hours and shortening the construction period by 55 days to save CNY 2.2 million in management costs. Through 3D digitization and visualization, the team reduced the environmental footprint of the project and have laid the foundation for developing a digital twin for digital bridge maintenance and operations.

A computer-generated image of a bridge with a red arch spanning a deep valley surrounded by lush green mountains. Construction and terrain leveling are visible on both sides of the bridge.

20% Off Bentley Software

Deal Ends Friday

Use Coupon Code "THANKS24"

Celebrate Infrastructure Delivery & Performance Excellence

The 2024 Year in Infrastructure
and Going Digital Awards

Nominate a project for the most prestigious awards in infrastructure! Extended deadline to enter is April 29th.