Home / Comprehensive Application Of BIM Technology For Power Transmission And Transformation Engineering Construction
PROJECT
Organization/Company

STATE GRID HENGSHUI ELECTRIC POWER SUPPLY COMPANY

Project Title

Comprehensive Application Of BIM Technology For Power Transmission And Transformation Engineering Construction

Award Category
Bentley Year in Infrastructure 2024
Location
Hengshui, Hebei, China
Utilized Software 

MicroStation, SYNCHRO

Image Credit: STATE GRID HENGSHUI ELECTRIC POWER SUPPLY COMPANY
Project Summary

The Qinghan substation project was initiated to improve grid structure and strengthen power supply in Gucheng County, Hengshui. With more than 20 disciplines and suppliers located across eight provinces, the project was difficult to control amid a global pandemic, and presented additional challenges given the proximity to live power supply equipment and soft soil conditions. The project team wanted to explore BIM processes as a new mode of power grid construction and needed an integrated digital solution.

Leveraging MicroStation and SYNCHRO, the team performed collaborative modeling, collision detection, and construction simulation, optimizing design and construction while saving a combined CNY 538,100. Working in a digital environment effectively resolved the insufficient soil bearing capacity and safety risks associated with the narrow construction space. Bentley’s comprehensive BIM solution reduced the construction period by 74 days and provided the basis for developing a digital twin of the power grid for full digital lifecycle operations and maintenance management.

Rendering Comprehensive Application of BIM Technology for Power Transmission and Transformation Engineering Construction

20% Off Bentley Software

Deal Ends Friday

Use Coupon Code "THANKS24"

Celebrate Infrastructure Delivery & Performance Excellence

The 2024 Year in Infrastructure
and Going Digital Awards

Nominate a project for the most prestigious awards in infrastructure! Extended deadline to enter is April 29th.