Home / Diablo Dam Digital Twin Modeling
PROJECT
Organization/Company

HDR

Project Title

Diablo Dam Digital Twin Modeling

Award Category
Bentley Year in Infrastructure 2024
Location
Whatcom County, Washington, United States of America
Utilized Software 

ContextCapture, ContextCapture Insights

Image Credit: HDR
Project Summary

After the overtopping of the dam in Oroville, California, Seattle City Light initiated major safety reviews of its six dams, including Diablo Dam on the Skagit River. To improve survey safety and efficiency, as well as minimize risks inspecting the 160-foot-high dam amid a global pandemic, HDR’s team was asked to provide aerial drone services to supplement physical inspections. They wanted to use the captured data to create a digital twin model of the structure.

They selected ContextCapture and the Bentley iTwin platform to create a digital twin, accurate within two centimeters, from over 82 million survey points. The team could merge architecture, engineering, and construction data with artificial intelligence across the lifecycle of the structure, identifying current and future maintenance and repair needs to ensure safety. The digital twin provides a single reference point for the owner to understand the structure and reduces project costs, while increasing surveyor safety and facilitating decision-making.

An aerial view of a large dam surrounded by a rocky landscape with water flowing through the dam and green forested areas in the background.

20% Off Bentley Software

Deal Ends Friday

Use Coupon Code "THANKS24"

Celebrate Infrastructure Delivery & Performance Excellence

The 2024 Year in Infrastructure
and Going Digital Awards

Nominate a project for the most prestigious awards in infrastructure! Extended deadline to enter is April 29th.