Project Title

North East Link Central Package 

Location
Melbourne, Victoria, Australia
Utilized Software 

GeoStudio, Leapfrog, OpenRoads, PLAXIS, ProjectWise

Image Credit: Spark and WSP
Project Summary

Victoria’s largest infrastructure project, the North East Link will improve connectivity in Melbourne’s freeway network, removing 15,000 trucks from congested roads. Successful delivery of the project required Spark’s engineering design team to bring in seven design consultancies, including WSP, who is responsible for modeling and communicating the complex geological site conditions and risks. To rapidly model, capture, visualize, and integrate the voluminous ground engineering data for multidisciplinary design evaluation, the team needed flexible, comprehensive geotechnical software and a connected data environment.  

Using Leapfrog, PLAXIS, and ProjectWise, WSP developed, refined, and delivered 3D subsurface models that were integrated into the federated project model for design analysis and construction planning. Working in a connected digital platform streamlined workflows, saving 1,500 hours in collaborative modeling. Through comprehensive geotechnical modeling, the team optimized risk management and design compliance, saving AUD 6 million, and were able to recycle excavation materials, saving an additional AUD 10 million. The 3D geological models will be incorporated into the digital twin to support tunnel operation and emergency management.

Abstract image with a dark blue background featuring a winding, multicolored path dotted with various geometric shapes and lines.

Celebrate Infrastructure Delivery & Performance Excellence

The 2024 Year in Infrastructure
and Going Digital Awards

Nominate a project for the most prestigious awards in infrastructure! Extended deadline to enter is April 29th.