Home / TPC Changhua Offshore Wind Farm Phase 2 Project
PROJECT
Organization/Company

Sinotech Engineering Consultants, Ltd.

Project Title

TPC Changhua Offshore Wind Farm Phase 2 Project

Award Category
Bentley Year in Infrastructure 2024
Location
Changhua County, Taiwan
Utilized Software 

OpenWindPower Fixed Foundation, SACS Pile Structure Design, SACS Wind Turbine Analysis Cloud Services

Image Credit: Sinotech Engineering Consultants, Ltd.
Project Summary

With a total power generation capacity of 300 megawatts, providing more than 1 billion units of electricity annually, the TPC Changhua Offshore Windfarm Phase 2 project will supply carbon-free electricity to approximately 270,000 households. Sinotech is designing the wind turbine generator support structures, requiring consideration of thousands of load scenarios. Faced with complicated geometry and voluminous data, they needed cloud-based, offshore structural design and analysis technology to complete the design in a timely manner.

Sinotech selected SACS to perform 80,000 load simulations, generating petabytes of data. Bentley’s application provided a dynamic modeling and analysis environment to complete the simulations in one and a half months, compared to three and a half using conventional methods. The software’s automated and comprehensive computing features saved 60% in design time and approximately five petabytes of local storage space.

Rendering Offshore Windfarm Phase 2 Project

20% Off Bentley Software

Deal Ends Friday

Use Coupon Code "THANKS24"

Celebrate Infrastructure Delivery & Performance Excellence

The 2024 Year in Infrastructure
and Going Digital Awards

Nominate a project for the most prestigious awards in infrastructure! Extended deadline to enter is April 29th.